Dell UPS 4200R User Manual
Page 23
Advertising
21
Installation and Startup
|
Starting the UPS
1
Verify that all load segment circuit breakers are in the ON position.
2
For 3750W/208V models only.
Verify that the power input to the UPS has a minimum of 30A
upstream overcurrent protection.
3
For hardwired input models only.
Switch the main utility breaker on.
4
Press the
button on the UPS front panel.
Advertising