Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) Intake- High-Ram Intake '03-07 w_Banks Boost Tube User Manual

Page 6

Advertising
background image

6

96425 v.2.0

7.

Being careful not to scratch or

gouge the mating surfaces of the

parts, completely remove the stock

gaskets from both sides of the heater

element block and intake manifold,

using a gasket scraper as needed.

clean and dry all sealing surfaces

thoroughly.

8.

Remove the driver side boost tube,

hoses and hose clamps. Retain the

factory hose and hose clamps at the

inlet of the factory driver side boost

tube for reuse with Banks Boost

Tube. The boost tube is the charge

air ducting that routes air from the

charge Air cooler (cAc) to the intake

manifold.

BANKS HIGH-RAM

INTAKe AND BooST TuBe

INSTALLATIoN
9.

Install Banks driver side boost

tube. The driver side tube use a 3.5

inch diameter hump hose and Spring

loaded clamps at the connection to

the Banks High-Ram and re-use the

factory hose and clamps at the cAc.

Keep the hose clamps loose until the

High-Ram is installed. The Orientation

of the hose clamps should be position

as shown in Figure 3 to avoid

clearance issues. cover the opening

of the boost tube to prevent foreign

objects from entering the boost tube

during the installation.
NOTE: Before slipping any boost tubes

and the corresponding hoses, into

position, ensure that all connection

ends are clean and free of any oil

residue and contaminates. Clean all

connection points with a non-oil

based solvent such as Acetone,

Mineral Spirits, Denatured Alcohol or

Lacquer Thinner. Read and follow the

manufactures operation instruction for

non-oil based solvent cleaner.

10.

Reinstall the electric heater

element block onto the intake

manifold, placing one of the supplied

gaskets between it and the intake

manifold. Reattach the three electrical
connections to the heater element.
CAuTIoN: The Banks studs have

different threads on each end.

11.

Make sure that the M8 ends go

into the engine intake manifold. The two

shorter studs go on the inboard side

(closest to the valve cover). Apply the

supplied thread lock compound at the

M8 ends and hand-tighten the studs

into the intake manifold.

Figure 2

Advertising