Banks Power Ford Trucks: (Diesel ’99 - 03 7.3L Power Stroke) Tuner- Six-Gun Diesel Tuner '99-03 User Manual

Page 15

Advertising
background image

96454 v.9.0

15

in the previous step. Route the red (RED)

wire out through the bottom of the fuse

box and reinstall the fuse box cover.

(It may be necessary to bend the fuse

tap/connector and route the wire around

several fuse box components to allow

clearance for the fuse box cover to snap

back into place.)
NotE: Make sure the Six-Gun

harness’s inline fuse holder is routed

outside the factory fuse box.

22.

Using a

3

16

” socket or wrench,

remove the lower left fuse block

mounting bolt shown in Figure 8.

Attach the ring terminal of the black

(BLK) wire from the power harness to

this point, reusing the stock bolt.
NotE: If you will be mounting the Six-

Gun module using anything other than

the supplied bracket, please refer to the

mounting instructions that accompanied

your chosen gauge mount, and skip to

step 25. Molded A-Pillar and dashboard

mounts, as well as additional digital

gauges are available though Gale Banks

Engineering.

23.

If you will be using the supplied

mounting bracket, choose a mounting

location that is easily viewed and

accessed from the driver’s seat. Hold

the bracket in place and mark through

the middle of each mounting slot, then

remove the bracket. check behind the

target hole locations to make sure that

there are no components nearby that

could be damaged by drilling, then drill

both mounting holes using a

3

16

” drill

bit.

24.

Install the bracket using the

supplied mounting hardware and tighten

finger-tight. After double-checking

bracket position and alignment, tighten

down the mounting hardware using a

Phillips screwdriver and

3

8

” wrench or

socket.

Figure 8: Recommended ground wire attachment point

Advertising