General installation practices, Tools required, Highly recommended tools and supplies – Banks Power Ford Trucks: (Diesel ’99 - 03 7.3L Power Stroke) Tuner- Six-Gun Diesel Tuner '99-03 User Manual

Page 8

Advertising
background image

8

96454 v.9.0

1.

Before starting work, familiarize

yourself with the installation procedure

by reading all of the instructions.

2.

The exploded views provide only

general guidance. Refer to each step

and section diagram in this manual for

proper instruction.

3.

Throughout this manual, the left side

of the vehicle refers to the driver side,

and the right side to the passenger side.

4.

Disconnect the negative (ground)

cable from the battery (or batteries, if

there are two) before beginning work.

5.

Route and tie wires and hoses a

minimum of 6” away from exhaust heat,

moving parts and sharp edges. clearance

of 8” or more is recommended where

possible.

6.

When raising the vehicle, support it

on properly weight-rated safety stands,

ramps or a commercial hoist. Follow

the manufacturer’s safety precautions.

Take care to balance the vehicle to

prevent it from slipping or falling. When

using ramps, be sure the front wheels

are centered squarely on the topsides.

When raising the front of the vehicle, put

the transmission in park (automatic) or

reverse (manual), set the parking brake,

and block the rear wheels. When raising

the back of the vehicle, be sure the

vehicle is on level ground and the front

wheels are blocked securely.
CAUTION: Do not use floor jacks to

support the vehicle while working

under it. Do not raise the vehicle

onto concrete blocks, masonry

or any other item not intended

specifically for this use.

7.

During installation, keep the work

area clean. Do not allow anything to

be dropped into intake, exhaust, or

lubrication system components while

performing the installation, as foreign

objects will cause immediate engine

damage upon start-up.

8.

Save this Owner’s Manual as a

reference for system maintenance and

service.

9.

Banks also recommends the following

airflow improvements (see Table 1)

to maintain safe engine operating

conditions and provide increased

power gains.

Tools Required:

• Standard and Metric sockets and

wrenches
• Standard and Phillips screwdrivers
• Foot-pound torque wrench
• Drill motor

3

16

” Drill bit

7

16

” Drill bit

1

4

” NPT tap and tap handle

Highly recommended

tools and supplies:

• Penetrating oil or light lubricant spray
• Heatgun

General Installation Practices

Advertising