Banks Power Ford Trucks: (Diesel ’99 - 03 7.3L Power Stroke) Exhaust- Monster Exhaust, Split-Dual '99-03 F-250 & F-350 pickup w_o catalytic converter User Manual

Page 9

Advertising
background image

9.

remove the exhaust backpressure

control valve assembly from the

factory turbine housing by removing

the seven (12-point, 8mm head)

bolts. retain these bolts for reuse.

10.

Install the banks power elbow

casting onto the outlet of the

turbocharger using the original

bolts. use the supplied anti-seize

compound on the bolts and tighten

them evenly. the torque specification

for these bolts is 62 in-lb (not ft-lb!)
Note: It may be necessary to re-

locate the transmission dipstick tube

to allow clearance for the V-band

clamp at outlet of Power Elbow. The

tube can be re-located with a prybar

or similar tool. There should be

3

4

”-

1” clearance between the tube and

the Power Elbow casting.

11.

On 1999

1

2

and later vehicles,

install support bracket between

power elbow casting and passenger-

side cylinder head using supplied

3

8

-16 x

3

4

” bolt, M10 x 1.5 x

20mm long bolt. see Figure 3. the

M10x1.5x20mm bolt is used on the

cylinder-head side of the bracket. the

3

8

-16x

3

4

“ bolt is used on the power

elbow side of the bracket.
Note: If a pyrometer is used, the

probe may be installed in the

threaded port, located on the side

of the Power Elbow casting. Remove

the plug and install the probe using

the anti-seize provided.

12.

locate the 7” x 24” blanket heat

shield provided. Form the heat shield

to the shape of the banks Monster

t.o.p. (turbine outlet pipe) in the

vertical section of the pipe. secure the

heat shield using the three (3) hose

clamps provided. (see Figure 4).

13.

reusing the saved V-band clamp

previously put aside, loosely clamp

the upper portion of the turbine

outlet pipe to the factory warm-up

valve/power elbow outlet. Do not

tighten at this time.
NOTE: On some Power Strokes a

ground strap is bolted on the back

of the cylinder head. This bolt may

interfere with the Banks turbine

outlet pipe. If so, remove the bolt and

relocate it in the cylinder head.

14.

On 2002 & 2003 models only,

it is necessary to relocate the

factory-installed frame-mounted

hanger pin that is located behind the

transmission crossmember.
A. remove the two (2) nuts that

hold the frame-mounted hanger

pin to the frame rail, save for

reinstallation later. remove the

frame-mounted hanger pin from

vehicle.

B. remove the two (2) 8mm studs

from the frame-mount hanger

pin. Note: Studs are pressed into

hanger pin and will require the

use of a hammer or small press to

remove.

C. reinstall the frame-mounted

hanger pin using the two (2)

5

8

long steel spacers, two (2) 8mm

x 1.25 x 45mm bolts and the two

(2) 8mm nuts (removed in Step A

above). see Figure 5 for proper

assembly sequence. torque

fasteners to 18 ft-lb.

15.

place a 4” exhaust clamp on the

turbine outlet pipe. Install the front

intermediate pipe onto the turbine

outlet pipe, aligning the hanger

pin in the rubber hanger. place a

4” clamp on the outlet of the front

intermediate pipe.
Note: ECSB model’s plastic cab

protector may need to be notched for

intermediate pipe hanger clearance.

16.

Install the rear intermediate pipe

as supplied (see Figure 1). Install a 4”

saddle clamp onto the intermediate

Figure 4

Figure 5

96484 v.3.0

9

Advertising