Banks Power Chevy_GMC Trucks: Duramax LLY-LBZ (Diesel ’06 - 07 6.6L) Power Systems- PowerPack & Stinger Systems w Economind (LLY & LBZ) '06-07 (PDA) Compatible w_ Optional PowerPDA User Manual

Page 31

Advertising
background image

96506 v.8.0

31

Section 6 not needed if installing

the Power Level Selector Switch. If

this is the case, please proceed to

Section 7.
Note: This system has been

designed for use with the Palm

Tungsten E2 PDA.
Warning: The PDa may be

susceptible to damage as a

result of extended exposure

to sunlight, heat or extreme

cold. It is highly recommended

that the PDa be removed from

its mounting location if the

vehicle will be subjected to high

concentrations of sunlight, heat

or cold for an extended period

of time. Gale Banks Engineering

is not responsible for damage to

PDas resulting from exposure

conditions.

1.

Locate the Universal Mount and

Docking Station in your kit. Now

interlock the docking station to the

Universal Mount by inserting and

sliding the Universal Mount tabs into

the Docking Station grooves. See

Figure 6.1.

2.

Loosen both knobs and move and

the swivel suction plate and Docking

Station to achieve desired viewing

angle of PowerPDA screen. Do a test

fit and note the angle necessary to

achieve the correct viewing angle.

Tighten both knobs to lock in the

position. See Figure 6.1.
Note: If the universal mount swivel

does not move or is tight after

loosening the hold down knob, then

remove the previously inserted

docking station and slightly loosen

the tension screw. See Figure 6.2.

3.

Locate the alcohol swap in the

kit. clean the suction cup and the

mounting area on the windshield and

let dry. With the suction lever in the

up position ensure the suction cup is

flat against the windshield then push

suction level down to secure in place.

4.

Locate the Banks OBD II Interface

cable in your kit. This cable has

three connection points. connect

the RED OBD II connector on the

Banks interface cable to the vehicle

OBD II connector. Use a cable tie as

shown in Figure 6.3 to secure the

Banks interface cable to the vehicle

OBD II connector. Next, connect the

6-pin connector on the Banks OBD II

interface cable to the 6-pin connector

on the EconoMind Tuner harness.

5.

Locate the RJ12 cable (similar to

telephone connector) on your Banks

Interface cable and pull enough cable

through to reach the bottom of the

Docking Station.

6.

Route the RJ12 cable to reach the

Docking Station and connect it to the

left most receptacle on the bottom of

the Docking Station.
Note: You may need to remove and

or loosen dash panel or covers to

install the RJ12 cable between dash

crevice or behind dash panels.
WarNING: THE CHarGING CaBLE

oN THE DoCkING STaTIoN

IS DESIGNED To SUPPLY a

CoNSTaNT LoW-VoLTaGE PoWEr

SoUrCE (+5VDC) To THE BaNkS

PoWErPDa aND IS “LIVE”

aS LoNG aS THE SYSTEM’S

oBD II INTErFaCE CaBLE IS

CoMPLETELY INSTaLLED aND THE

rJ12 CoNNECTor IS PLUGGED

INTo THE DoCkING STaTIoN.

aLTHoUGH THIS CHarGING CaBLE

IS SHorT aND ITS CIrCUITrY IS

FUSE-ProTECTED, THE USEr IS

ExPECTED To TakE aPProPrIaTE

MEaSUrES To PrEVENT SMaLL

Section 6

MoUNTING THE DoCkING STaTIoN aND CoNNECTING THE BaNkS PoWErPDa

VEHICLE CoMMaND CENTEr

Figure 6.1

Figure 6.2

Advertising