Banks Power Jeep Trucks: (Gas ’12 - 14 3.6L) Ram-Air Intake System 3.6L Wrangler User Manual

Page 2

Advertising
background image

2

96579 v.1.0

Dear Customer,

If you have any questions

concerning the installation of

your Banks Ram-Air System,

please call our Technical Service

Hotline at (888) 839-2700

between 7:00 am and 5:00 pm

(PT). If you have any questions

relating to shipping or billing,

please contact our Customer

Service Department at

(888) 839-5600.
Thank you.

1

1.

For ease of installation of your

Banks Ram-air intake system,

familiarize yourself with the procedure

by reading the entire manual before

starting work.

2.

The exploded view of the Ram-Air

assembly (pages 4-5) provides only

general guidance. Refer to each step

and section diagram in this manual for

proper instruction.

3.

Throughout this manual, the

left side of the vehicle refers to the

driver’s side, and the right-side to the

passenger’s side.

4.

Disconnect the ground cable from

the battery before beginning work. If

there are two batteries, disconnect

both.

5.

Route and tie wires and hoses

a minimum of 6 inches away from

exhaust heat, moving parts and sharp

edges. clearance of 8 inches or more

is recommended where possible.

6.

During installation, keep the

work area clean. If foreign debris

is transferred to any Banks system

component, clean it thoroughly before

installing.

7.

When raising the vehicle, support

it on properly weight-rated safety

stands, ramps or a commercial hoist.

Follow the manufacturer’s safety

precautions. Take care to balance the

vehicle to prevent it from slipping or

falling. When using ramps, be sure the

front wheels are centered squarely on

the topsides; put the transmission in

park; set the parking brake; and place

blocks behind the rear wheels.
CAutIoN! Do not use floor jacks to

support the vehicle while working

under it. Do not raise the vehicle

onto concrete blocks, masonry

or any other item not intended

specifically for this use.
Notification

the Banks Ram-Air Filter comes

pre-oiled and no oiling is necessary

for initial installation. Service the

filter as specified in the Filter

Maintenance Section of this

manual.

General Installation Practices

table of Contents

Products available . . . . . . . . . . . . . . 3
Section 1 . . . . . . . . . . . . . . . . . . . . . . 4

General Assembly
Section 2 . . . . . . . . . . . . . . . . . . . . . . 6

Ram-Air Installation
Section 3 . . . . . . . . . . . . . . . . . . . . . 11

Filter Maintenance

tools Required:

10mm

socket wrench

• Standard head screwdriver
• Standard pliers

5

16 in

nut driver

5

64 in

allen wrench

• Clean shop towels or rags

Advertising