Banks Power Dodge Trucks: (Diesel ’03 - 07 5.9L Cummins) Power Pack & Stinger Systems w_EconoMind '03-05 Compatible with Banks iQ User Manual

Page 11

Advertising
background image

96820 v.4.0

11

14.

Install the front hanger clamp

onto the Monster Muffler inlet.

Install the muffler inlet onto the

intermediate pipe or catalytic

converter if equipped. With the

hanger facing the rear of the vehicle,

insert the front hanger into the

vehicle’s rubber grommet.

15.

Install the rear hanger clamp

onto the Monster Muffler outlet with

the hanger pins facing forward. Install

the two (2) rear hanger pins into the

vehicle’s rubber grommets. Orient

the Banks Monster logo to be level

with the frame rail. Install a 4” clamp

onto the muffler outlet.

16.

Route the tailpipe over the rear

axle housing and into the muffler

outlet. Install the tailpipe hanger

pin into the corresponding rubber

hanger.

17.

Install the 5” Monster tailpipe tip

on the exhaust. Keep the wrapping

on until installation is complete. The

tip should be rotated so the clamp

nut is pointing down. For a fleet-side

truck the 5” tip should be hung 1”

past the end of the tailpipe. For a

dually, the tip should be 3-

1

2

” past

the end of the tailpipe or where

aesthetically pleasing.

18.

With everything positioned

properly, begin to tighten the clamps

starting with the ones closest to the

turbo and working your way back.

Torque the V-band clamp to 80 in-lbs

(not ft-lbs). Evenly torque the exhaust

clamps to 35 ft-lbs. Torque the

7

16

hardware to 48 ft-lbs. Make sure that

each slip is fully inserted (+/-

1

4

inch)

and that all mount hangers are in the

forward position (see Figure 3).
NOTE: Whenever possible, tack

weld slip connections to prevent

disengagement is recommended.

19.

Remove the protective covering

from the tailpipe tip.
Caution: the protective covering

may ignite and burn if not

removed prior to running the

engine.

20.

Monster Exhaust Single tip

installation complete, proceed to

Section 2.
Step 21 thru 33 for Split Dual

21.

Install the front hanger clamp

onto the Monster Muffler inlet. Install

a 4” clamp onto the muffler inlet.

Install the muffler inlet onto the

intermediate pipe. Insert the front

hanger into the vehicle’s rubber

grommet.

22.

Install the rear hanger clamp

onto the Monster Muffler outlet with

the hanger pins facing forward. Install

the two (2) rear hanger pins into the

vehicle’s rubber grommets. Orient

the Banks Monster logo to be level

with the frame rail.

23.

Install the Banks Y-pipe into the

muffler outlet such that the outlets

are pointing up. Install a 3-

1

2

” saddle

clamps onto each y-pipe outlet (see

Figure 4).

24.

Install the Banks hanger bracket

onto the rear of the driver-side frame

rail. Behind the rear shock cross

member, place the hanger bracket

over the frame rail on the inside.

Align the

1

2

” hole in the center of

the frame with the hanger bracket.

Install the

7

16

”x 4” bolt & washer

through the bracket and frame rail.

Secure the bolt on the outside frame

rail using the 2”x2” plate, washer

and

7

16

” nut. Be sure the hanger

pin is parallel with the frame rail and

torque

7

16

” hardware to 48 ft-lb (see

Figure 5).

Figure 3

DRIVER SIDE

TAILPIPE

PASSENGER

SIDE

TAILPIPE

3.5”

CLAMP

REAR

HANGER CLAMP

ORIENTATION OF

MONSTER MUFFLER

FRONT

HANGER

CLAMP

FORWARD

4“

CLAMP

INTERM

PIPE

Y-PIPE

Figure 4

Advertising