Banks Power Chevy_GMC Trucks: Duramax LMM (Diesel ’07 - 10 6.6L) Speed Control- SpeedBrake '07-08 (PDA) For use with PowerPDA User Manual

Page 16

Advertising
background image

16

97229 v.8.0

Figure 14 optional tuner-to-SpeedBrake wire

WaRNING: The charging cable on

the docking station is designed

to supply a constant low-voltage

power source (+5vdc) to the

Banks PowerPDa and is “live”

as long as the system’s oBD II

Interface Cable is completely

installed and the RJ12 connector

is plugged into the docking

station. although this charging

cable is short and its circuitry

is fuse protected, the user is

expected to take appropriate

measures to prevent small

children and/or pets from contact

with any part of this system.

10.

Route all wiring away from any

pedals or other moving components.

Using the cable ties supplied, secure

the wiring under the dash.

11.

Double check everything to make

sure it is securely fastened and it is

not near any heat source or moving

parts before starting engine.

12.

Set up the Banks PowerPDA

according to its instructions.

13.

Re-connect the negative (ground)

cable(s).

-END, SEcTION 2-

Figure 13

Advertising