29.

Align and carefully rotate the

Banks Torque Converter to engage the

turbine shaft splines to the converter

drive pilot hub. Continue rotating push-

ing the converter inward to engage the

stator shaft splines to the stator race

and the drive flats on the converter to

the oil pump drive gear. Be sure the

converter drive pilot hub is fully seated

in pump gears.

30.

Check converter seating with a

ruler and straightedge (Figure 8).
Note: Converter is properly seated

when the distance from the lugs to the

mounting face is the same as recorded

measurement taken before removal

of factory torque converter. Refer to

measurement record in step 24.

31.

Raise the transmission and align

the converter with the drive plate.

32.

Move the transmission towards

the engine and raise/tilt the transmis-

sion to align the converter housing with

alignment dowels.

33.

Seat the front converter hub into

the crankshaft by aligning the transmis-

sion over the alignment dowels.
Note: Check to see if torque converter

will rotate smoothly and will not bind

with the crankshaft.

34.

Install the factory bolts and studs

through the converter housing and into

engine.

35.

Reinstall the transmission cross

member to the vehicle frame. Lower

the transmission onto the cross mem-

ber to the vehicle frame. Install and

tighten the bolts attaching the trans-

mission mount to the cross member

cushion.

36.

Reinstall the wire harness/vent

tube bracket and nut to the top of the

converter housing.

37.

Reinstall the fill tube and nuts to

the converter housing.

38.

Install the park/neutral position

switch, turbine speed sensor, and the

output and input speed sensor connec-

tor. Reconnect the transmission main

electrical connector.

39.

Shift the park/neutral position

switch forward to put the transmission

in the park position. Connect the shift

cable over the selector lever ball stud

and connect the cable to the bracket.

40.

Rotate the crankshaft bolt in front

of the engine to install torque con-

verter bolts thru the starter opening.

Reinstall the torque converter bolts and

torque to 44 ft-lbs.

41.

Reinstall the rear propeller shaft.

Be sure to realign the marks on propel-

ler shaft and yoke.

42.

For 4x4 models - Reconnect the

Front propeller shaft to the front axle

pinion yoke and realign the marks on

the propeller shaft and yoke.

43.

Reinstall the starter motor.

44.

Reinstall cooler line bracket and

connect the cooler lines to the trans-

mission.

45.

Torsion Bar installation

A. Slide the Cross Member over

the weld nuts and drop into place.

Reinstall factory bolts and tighten to

70 ft-lbs.

B. Slide the Torsion Bar into the

lower control arm. Slide the Adjust-

ment Arm into the Cross Member.

While holding the Adjustment Arm

in place, slide the Torsion Bar from

the lower control arm rearward into

the Cross Member. Make sure the

Torsion Bar slides into the Adjust-

ment Arm and is properly inserted.

96732 v.2.0

13