Important, Read this before installing banks torquetube, Manifolds on super-duty and 1-ton 4wd trucks – Banks Power Ford Trucks: (Gas ’87 - 97 7.5L EFI) PowerPack, Stinger & TorqueTube system '87-97 For Use w_ 460 EFI Engine User Manual

Page 3: Sway bar link bracket installation procedure

Advertising
background image

IMPORTANT!

Read This Before Installing Banks TorqueTube

®

Manifolds on

Super-Duty and 1-Ton 4WD Trucks

3

P.N. 96352

1.

Disconnect right sway-bar link from sway bar

and bracket at right frame rail. Retain all

hardware for reinstallation.

2.

Unbolt sway-bar bracket from inside of right

frame rail. Retain 3 bolts and nuts for

reinstallation.
NOTE: Some trucks use rivets to mount this bracket.

Rivets must be drilled out to remove factory bracket.

3.

Using original hardware or new hardware, if

required, install new bracket supplied to the

outside of the frame rail where the original bracket was

removed. Clean frame rail of any undercoat or road dirt

in area where bracket will contact frame.

4.

Install original sway-bar link bolt through the

lower hole in the bracket with the head of the

bolt facing the engine. Install sway-bar link on the

outside of the bracket over the bolt, then install and

tighten original nut and washer.

5.

Reassemble sway-bar link to sway bar with

original hardware and rubber bush

ings.

When installing the Banks PowerPack or Banks

TorqueTubes on 2WD Super-Duty and 1-ton 4WD

trucks with a single I-beam or tubular front axle

(not swing-arm independent), a new sway bar

link bracket (part no. 48899) must be installed for

exhaust manifold clearance.
This bracket must be installed and assembled

to the sway bar link before installing the Banks

TorqueTubes. This bracket is not required on 2

or 4-wheel drive trucks with the dual swing-arm

front axle.

SWAY BAR lINK BRACKET INSTAllATION PROCEDURE

Advertising