Figure 3 – Banks Power Ford Trucks: (Gas ’87 - 97 7.5L EFI) PowerPack, Stinger & TorqueTube system '87-97 For Use w_ 460 EFI Engine User Manual
Page 7

7
P.N. 96352
FIGURE 3
washer must face each other when installed on bolt.
See Figure
1
for proper washer installation.
12.
Install left-hand Banks TorqueTube manifold from
under the vehicle. Use two bolts to temporarily
hang and position the manifold on the cylinder head.
Thread EGR tube and air injection tube (if equipped) in
fittings on Banks TorqueTubes. NOTE: Early-model air
injection systems require an adapter nipple (supplied)
for hook-up, see Figure
2
.
Because of the tight confines, we suggest that the EGR
tube and air injection tube (if equipped) be tightened
into the manifold with the manifold loosely attached
to the head (this allows for some additional freedom of
movement). In some cases, the EGR and air injection
tubes may have to be tightened with the manifold
completely separated from the head, then bolted to
the head when wrenching the tubes is completed. Air
injection tube may be loosened from its upper support
bracket to aid in alignment during installation. A dab of
anti-seize on the tube threads will aid in assembly.
Once this procedure is complete, install remaining
manifold bolts finger tight, with anti-seize applied. See
Figure 2 for bolt locations. Reinstall dipstick tube and
dipstick, bolt dipstick to tab on manifold with hardware
indicated in Figure
2
.
13.
Reinstall sparkplugs and sparkplug wires.
Sparkplug wire heat shields should be positioned
between sparkplug wire boot and manifold