3torquetube installation procedure – Banks Power Jeep Trucks: (Gas ’91 - 06 Wrangler 4.0L) Exhaust- TorqueTube system 4.0L I-6 ('00-06 Wrangler_'00-01 Cherokee_'99-01 Grand Cherokee) User Manual

Page 3

Advertising
background image

96434 v.7.0

3

TorqueTube Installation

Procedure

NOTE: Do not wrap TorqueTube.
Wrapping the TorqueTube with exhaust
wrap or thermo tape will void the
TorqueTube warranty. Exhaust wrapping
can cause the TorqueTube to crack and
rust. The TorqueTube has been designed
to operate efficiently and protect the
engine components with out the use of
wrapping.

1.

Remove the air inlet tube from the

throttle body and set it aside. On some
models, the air box assembly may need

to be removed in order to relocate the
air inlet tube (see

Figure 1).

2.

On the intake manifold assembly,

remove the throttle cable,
transmission pressure cable and cruise
control cable (if equipped) located
inside the engine compartment.

3.

Disconnect any electrical

connectors and vacuum lines on the
intake manifold and throttle body. Be
sure to label the lines to ensure
correct replacement.

4.

Remove the fuel line from the fuel

rail on the intake manifold. A fuel-line

Figure 1

Advertising