Banks Power Chevy_GMC Trucks: Duramax LMM (Diesel ’07 - 10 6.6L) Speed Control- SpeedBrake '07-10 (iQ) For use with Banks iQ Only User Manual

Page 16

Advertising
background image

16

97240 v.6.0

Note: If your vehicle is equipped with

a Banks Diesel tuner, optional tuner-

to- SpeedBrake cable will be needed

(P/N 55412). See Figure 14. Disconnect

the 6-pin terminal connections between

Banks oBD II Interface Cable and Banks

Diesel tuner. Connect the oBD II 6-pin

male connector to the optional tuner-

to-SpeedBrake 6-pin female connector.

Connect the two (2) wire male connector

to the Diesel tuner female 6-pin

connector and connect the four (4) wire

male connector to the SpeedBrake

female 6-pin connector.

8.

Locate the RJ12 cable (similar to

telephone connector) on your Banks

OBDII interface cable

. See figure 15.

9.

Locate Banks iQ Bridge Module and

connect the RJ12 connector into the

Bridge Module. See figure 16.

10.

Route the Banks iQ USB interface

cable from the Banks iQ Bridge Module

under the dash and out through the fuse

access panel opening. The cable can be

slid under the door frame’s seal and run

up to the top of the dash. Pull enough

cable to reach the Banks iQ and connect

it to the USB receptacle on the left side

of Banks iQ. See figure 12. Snap the

fuse access panel back in place making

sure not to pinch the wire.

WaRNING: THE CHaRGING CaBLE

CoNNECTED To THE BaNkS IQ IS

DESIGNED To SUPPLY a CoNSTaNT

LoW-voLTaGE PoWER SoURCE

(+5vDC) To THE BaNkS IQ aND IS

“LIvE” aS LoNG aS THE SYSTEM’S

oBD II INTERfaCE CaBLE oR BaNkS

WIRING HaRNESS IS CoMPLETELY

INSTaLLED aND THE USB CaBLE

CoNNECToR IS PLUGGED INTo

BaNkS IQ. aLTHoUGH THIS

CHaRGING CaBLE IS SHoRT aND

ITS CIRCUITRY IS fUSE-PRoTECTED,

THE USER IS ExPECTED To TakE

aPPRoPRIaTE MEaSURES To

PREvENT SMaLL CHILDREN aND/

oR PETS fRoM CoNTaCT WITH aNY

PaRT of THIS SYSTEM.

11.

Secure Banks iQ Bridge Module

under the dash to any dash frame

support using the supplied cable ties.

Use the cable tie support loops on the

side of the Bridge Module to securely

fasten it under the dash.

12.

Route all wiring away from any

pedals or other moving components.

Using the cable ties supplied, secure the

wiring under the dash.

13.

Reinstall the lower knee panel back

in place with the factory hardware. Tuck

any excess cable behind it for a clean

appearance.

-END, SECTION 2-

Advertising