Banks Power Dodge Trucks: (Diesel ’07 - 12 6.7L Cummins) Intake- Ram-Air Intake System '07-10 User Manual

Page 3

Advertising
background image

96497 v.7.0

3


Dear Customer,

If you have any questions

concerning the installation of

your Banks Ram-Air System,

please call our Technical Service

Hotline at (888) 839-2700

between 7:00 am and 5:00 pm

(PT). If you have any questions

relating to shipping or billing,

please contact our Customer

Service Department at

(888) 839-5600.
Thank you.

1

1.

For ease of installation of your Banks

Ram-air intake system, familiarize

yourself with the procedure by reading

the entire manual before starting work.

2.

The exploded view of the Ram-Air

assembly (pages 4-5) provides only

general guidance. Refer to each step

and section diagram in this manual for

proper instruction.

3.

Throughout this manual, the left side

of the vehicle refers to the driver’s side,

and the right-side to the passenger’s

side.

4.

Disconnect the ground cable from the

battery before beginning work. If there

are two batteries, disconnect both.

5.

Route and tie wires and hoses

a minimum of 6 inches away from

exhaust heat, moving parts and sharp

edges. clearance of 8 inches or more is

recommended where possible.

6.

During installation, keep the work

area clean. If foreign debris is transferred

to any Banks system component, clean it

thoroughly before installing.

7.

When raising the vehicle, support it

on properly weight-rated safety stands,

ramps or a commercial hoist. Follow the

manufacturer’s safety precautions. Take

care to balance the vehicle to prevent

it from slipping or falling. When using

ramps, be sure the front wheels are

centered squarely on the topsides; put

the transmission in park; set the parking

brake; and place blocks behind the rear

wheels.

CAuTIoN! Do not use floor jacks to

support the vehicle while working

under it. Do not raise the vehicle

onto concrete blocks, masonry

or any other item not intended

specifically for this use.

Notification

The Banks Ram-Air Filter comes

pre-oiled and no oiling is necessary

for initial installation. Service the

filter as specified in the Filter

maintenance Section of this

manual.

Tools Required:

• 3⁄8” drive ratchets with metric

sockets
• Standard and Phillips head

screwdrivers
• Standard and needle-nose pliers
• Clean shop towels or rags
• 5⁄16 nut driver
• Hack Saw
• Ruler

General Installation Practices

Table of Contents

Section 1 . . . . . . . . . . . . . . . . . . . . . . 4

General Assembly
Section 2 . . . . . . . . . . . . . . . . . . . . . . 6

Ram-Air Installation
Section 3 . . . . . . . . . . . . . . . . . . . . . 18

Filter Maintenance

Advertising