Preparation for roof exhauster installation, Chapter 8: accessories – Grain Systems Tanks PNEG-4072G User Manual

Page 126

Advertising
background image

Chapter 8: Accessories

Table 8-2 Peak-to-Exhauster Ladder Rung Kit

Bin Diameter

Location

72 ft

75 ft

78 ft

90 ft

105 ft

135 ft

Bin Peak

37

LS-260-1

36

LS-260-1

Bolt Hole
Count
Located on
the Roof Rib

35

LS-260-1

34

LS-260-2

33

LS-260-2

32

31

30

29

LS-260-1

28

LS-260-1

27

LS-260-1

26

LS-260-2

25

LS-260-1

24

LS-260-1

23

LS-260-2

22

LS-260-2

21

LS-260-1

20

LS-260-1

LS-260-2

19

LS-260-1

LS-260-2

LS-260-3

18

LS-260-2

LS-260-3

LS-260-3

17

LS-260-3

LS-260-3

16

LS-260-3

Bin Eave

12

11

NOTE: The table above shows the correct ladder step and part number to be installed in the corresponding

hole in the roof rib. Shaded areas show the correct roof exhauster ladder step and part number
with the corresponding hole in the roof rib.

Preparation for Roof Exhauster Installation

Before installing the roof exhauster, some preparation is required, utilizing the roof exhauster mounting
plate and the roof panels that span the roof exhauster mounting plate.

Before You Begin

Determine the location of the roof exhauster and set aside the roof panels that the roof exhauster mounting
plate will span.

What You Should Know

This procedure is to cut the exhauster airflow hole. Use the roof exhauster mounting plate as a template to
determine the correct location for field drilling and cutting the roof exhauster hole.

126

Pneg-4072G 72 Ft Diameter 40-Series Bin

Advertising