Grain Systems PNEG-1874 User Manual
Page 34
Advertising
![background image](/manuals/277555/34/background.png)
5. 18' Inside Catwalk Installation Instructions
34
PNEG-1874 18' Tower Dryer Fan Style Catwalk Assembly
Installing Planks (GT1-2033) to Outer Toe Board (GT1-2062)
(Continued)
2. Install all the planks (GT1-2033) continuously around the dryer.
Figure 5G
3. Outer toe board (GT1-2062) is arranged with many slots to install plank. Install planks to
corresponding slots as shown in
.
Figure 5H 18' Outer Toe Board (GT1-2062)
Advertising