Cga series 2000 heater installation, Transition hi-limit installation – Grain Systems PNEG-582 User Manual

Page 9

Advertising
background image

9

CGA SERIES 2000 HEATER INSTALLATION

PLENUM TEMPERATURE

SENSOR MOUNTING

The plenum temperature sensor is
the small gray PVC junction box at-
tached by a cord to the fan/heater
control box.

1. 24" to the right side of the transi-

tion, drill one 3/8" hole in the cen-
ter of the plenum in a valley on
the bin sidewall.

2. Insert the probe through the hole.

3. Position the housing so that the

tabs are vertical, and the cord
exits the housing horizontally.

4. Use two self drilling screws to mount

the housing to the bin sidewall.

5. Caulk between the housing and

the sidewall to seal.

Plenum temperature sensor installation.

1. Mark location on transition one

(1) foot up from the bottom
(entrance collar) and centered
in the transition.

2. Drill or knock out 7/8" diameter

hole on marked location.

3. Install transition hi-limit using

supplied self drilling screws.

TRANSITION HI-LIMIT INSTALLATION

Figure 1: The transition connecting the Series 2000 Heater to the bin with

the plenum sensor in place.

Advertising