Discharge gate ground control kit – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1902 User Manual

Page 3

Advertising
background image

PNEG-1902

Page 3 of 7

Discharge Gate Ground Control Kit

2. Attach the ground control wheel bracket to the bin wall directly below the idler bracket. Assemble the

wheel mounting bracket loosely to the wall bracket and slide it up as far as possible.

(See Figure 4.)

Figure 4

3. Assemble the control wheel to the shaft and secure with cotter pins.

(See Figure 5.)

NOTE: It is recommended to use anti seize on the shaft.

Figure 5

Bin wall mounting
bracket (8101157)

Wheel mounting
bracket (8101158)

Wheel drum
(8101537-GY)

Cotter pin
(S-6994)

Advertising