Chapter 7: roof assembly – Grain Systems Tanks PNEG-4090A User Manual
Page 122

Installing the Conveyor Support Brackets to the Peak Cap
Conveyor support brackets are attached to the peak cap and allow support for a conveyor or catwalk
system.
1. Place tube caulk around the bolt holes located in the cap plate where the conveyor support brackets
(B) will be installed.
2. Position a conveyor support brackets (B) against the cap plate and align the holes.
3. Install flange bolts (A) and secure with flange nuts (C).
4. Tighten to the recommended torque specification. See
Bolt Torque Specifications, page 24
.
Figure 7-42 Conveyor support brackets
A
3/8 x 1-1/2 in. flange bolt, (S-7488)
C
3/8 in. flange nut (S-456)
B
Conveyor support bracket (CTR-0087)
D
Caulk
After You Finish
Repeat this procedure for the remaining conveyor support brackets.
122
Pneg-4090A 90 Ft Diameter 40-Series Bin