Installing the 6–hole intermediate purlins, Chapter 7: roof assembly – Grain Systems Tanks PNEG-4075A User Manual

Page 109

Advertising
background image

Chapter 7: Roof Assembly

Installing the 6–Hole Intermediate Purlins

Intermediate purlins must be installed to connect each A-frame roof rafter assembly together. The inter-
mediate purlins connecting each A-frame roof rafter assembly have six holes on each side to secure them
with the purlin clips.

Before You Begin
All A-frame roof rafter assemblies must be installed and secured to both the center collar and the eave
brackets.

1. Install the intermediate purlin (A) to the purlin clips (B and D) located outside of each A-frame roof

rafter assembly (E).

2. Install six flange bolts (C) and six flange nuts (F) to each end of the purlin (A) securing the intermedi-

ate purlin to the purlin clips.

3. Tighten the hardware to the recommended torque specifications. See

Bolt Torque Specifications,

page 24

.

Figure 7-32 Exploded view of the 6–hole intermediate purlin

A

Purlin

D

Left Purlin clip (CTR-0099)

B

Right Purlin clip (CTR-0100)

E

A-frame roof assembly

C

1/2 x 1-3/4 in. flange bolt (S-10252)

F

1/2 in. flange nut (S-10253)

NOTE: Purlin part numbers will vary with location.

After You Finish
Repeat this procedure for the remaining 6–hole intermediate purlins of the roof assembly.

Pneg-4075A 75 Ft Diameter 40-Series Bin

109

Advertising