Chapter 2: top platform assembly – Grain Systems PNEG-1936 User Manual

Page 17

Advertising
background image

Chapter 2: Top Platform Assembly

Assembly of sidewall attachment brackets and knee braces to stiffeners

Table 2-2 Assembly Sequence

Callout

Part number

Quantity

B

STR-1162

2

A , C

S-7927 , S-968

6 , 6

D

STR-1165

2

A , C

S-7927 , S-968

4 , 4

NOTE: Start the assembly with the stiffener on the

sidewall sheet below the manway hole loca-
tion on the roof.

Assembly of sidewall attachment bracket and knee brace to sidewall sheet

Table 2-3 Assembly Sequence

Callout

Part number

Quantity

B

STR-1162

1

A , C

S-7927 , S-968

3 , 3

D

STR-1165

1

A , C

S-7927 , S-968

2 , 2

IMPORTANT: B and D should be centered and aligned

exactly between the two sidewall stiff-
eners. Field drill the holes in the side-
wall sheet to attach B and D.

Assembly of sidewall attachment bracket and knee brace to stiffener

Table 2-4 Assembly Sequence

Callout

Part number

Quantity

B

STR-1162

1

A , C

S-7927 , S-968

3 , 3

D

STR-1165

1

A , C

S-7927 , S-968

2 , 2

NOTE: Align B to the stiffener holes (10,11 and 12)

from the top of the sidewall sheet.

PNEG-1936 Top Dryer

17

Advertising