Transition high-limit installation – Grain Systems PNEG-1776 User Manual

Page 19

Advertising
background image

5. Installation

PNEG-1776 Deluxe Downwind Heater - Canadian

19

Transition High-Limit Installation

1. Mark location on transition one foot up from the bottom (entrance collar) and centered in

the transition.

2. Drill or knock out 7/8" diameter hole on marked location.

3. Install transition high-limit using supplied self-drilling screws.

Figure 5F The transition connecting the heater to the bin with the plenum thermostat in place.

Advertising