PNEG-1753 Fall Restraint Reinforcement Kit
13
4. Installation in Existing Tanks
This section is for the installation of the Fall Restraint Reinforcement Kit to be retrofit in existing tanks only.
See Chapter 3
for installing in newly constructed tanks.
105'-25K Roof Fall Restraint Reinforcement Installation Instructions
for CRP-6948
The center collar, all of the roof beam stiffeners and one eave tension plate will need to be drilled to allow
for the assembly of this reinforcement kit.
1. Use CRP-6943 as a template to locate and drill four (4) 7/16" holes and one 9/16" hole in every roof
beam stiffener as shown in
. Drill one 11/16" hole in only one roof beam stiffener at the
termination point.
Figure 4A