Installation procedure, Wallboard installation, Seat panel – Swanstone BK-326072 - Installation User Manual

Page 14

Advertising
background image

Wallboard Installation

This shower kit contains a recessed shampoo shelf that
fits into a standard wall stud opening. Before covering
the studs, determine the location of the recessed
shampoo shelf and make sure there are no pipes or
electrical wiring in this space. Marking the stud locations
on the cement board as it is installed (above 72” from the
floor) can help when later locating the wall stud opening.

1.

Cut out openings for the shower faucet(s) and
shower head. Install 1/2” moisture-resistant cement
board or greenboard over back (1), front (2), and
rear (6) wall surfaces of the rough opening. Install
cement board or greenboard over all the surfaces of
the seat area (3, 4, & 5). Follow the cement board
manufacturer’s recommendations for installation.

Install the wall board with a 1/2” gap above the shower
base side lip, the front edge of the shower base, and the
floor to prevent possible water (wicking affect) damage
to the wall.

2.

Apply a coat of water or oil-based primer/sealer to
all the surfaces of the cement board or greenboard
(follow the manufacturers’ instructions). Allow the
primer to dry thoroughly before applying any
silicone.

Seat Panel

1.

Cut the seat panel to length. To prevent scratching,
protect the surface of the panel from the bottom of
the saw using masking tape.

NOTE: The length of the seat can vary, depending on
the amount of desired overhang and the type of material
used to cover the end of the bench seat. The width of
the bench seat is precut to 12-3/4” to provide a 1/2”
overhang.

BK-BS-001

BK-WB-002

1/2"

1/2"

1/2"

IMPORTANT NOTICE

BK-WB-001

3

1

2

4

5

6

IMPORTANT NOTICE

The Swan Corporation – Swanstone

14

800-325-7008

Installation Procedure

Advertising