Factory Direct Hardware Belle Foret C11 User Manual

Copper basin installation instructions, Overcounter installation, Undercounter installation

Advertising
background image

Copper Basin Installation Instructions


Because Belle Forêt copper basins are handmade,

overall and installation dimensions can vary in size from

specifications, and from basin to basin. It is strongly

recommended that the actual basin to be installed be

used as the cut-out dimensions.

OVERCOUNTER INSTALLATION:

1. Place basin rim on countertop and lightly trace outer rim.
2. Draw a parallel line ½” inside the traced-rim line. This line is your cutout.

Cut countertop along the inner line. (Adjustments may be necessary for
lavatory overflows.)

3. Test fit basin and modify cutout as necessary.

4. Secure with silicone or other appropriate sealers.


UNDERCOUNTER INSTALLATION:

1. Place basin rim on countertop and lightly trace outer rim.
2. Cut countertop to conform to inside dimensions of basin, or as desired by

customer.

3. Test fit basin and modify cutout as necessary.

4. Secure with optional mounting brackets (order separately), silicone or

other appropriate sealers.

Advertising