Unpacking, handling, and frame installation – GE Industrial Solutions Micro-BDCBB User Manual
Page 30
J85568E-1 Secondary DC Mini-Distribution Bay
5 - 2 Installation
Issue 6 January 2008
Unpacking, 
Handling, and 
Frame 
Installation
Before opening the packaging, carefully inspect the outside in 
the presence of shipping personnel for signs of damage. If 
damaged, follow the shipping carrier's procedure for filing a 
damage claim.
Carefully open the packaging to verify that the contents are 
complete and undamaged. If the equipment must be returned, it 
should be repacked in the original shipping crate.
The following items are shipped loose with the 
Mini-Distribution Bay:
•
(10) 12-24 x 5/8-inch self tapping screws (not provided with 
List A)
•
Product manual and drawing service kit containing a copy 
of the J85568E-1, T83178-30, and SD83178-01 drawings
•
(100) sets of 1/4-20 nuts, lockwashers, and washers for 
terminating distribution cabling
•
(2) sets of 1/4-20 screws, lockwashers, and washers for 
terminating frame ground
•
(2) 847257862 bus bars for connecting bottom load feeds
•
Cover plates for the framework base (List A only)
If the Mini-Distribution Bay is mounted in the List A 
framework, the framework should be secured to the floor. Figure 
5-1 shows typical floor mounting details for concrete floors. 
Other types of floor construction may require other mounting 
methods. Holes can be located using Figure 5-2.
If the Mini-Distribution Bay is to be mounted in a 23-inch relay 
rack that is already installed in the field, use the (10) 12-24 x 
5/8-inch self-tapping screws that were shipped with the unit for 
this purpose.
When the unit is installed, connect the load and distribution 
cabling. The Mini-Distribution Bay is for top load feed 
applications. When bottom load feed is required, the J85568C-1 
BDFB/BDCBB is recommended because it provides for routing 
cable to the floor.