4 rectifiers, 5 ac input panels, 6 battery connection panels – GE Industrial Solutions GPS 4848_100 Users Guide (dual rectifier shelf) User Manual
Page 6: 7 dc distribution panels
Advertising

Galaxy Power System 4848/100 with Dual Rectifier Shelf
2 - Table of Contents
Issue 5 September 2011
Selective High Voltage Shutdown (SHVSD)
Backup High Voltage Shutdown (BHVSD)
Restart 4-3
Output Circuit Breaker
Controller Communications Alarm
Autonomous Operation of the Rectifier
Connectorized 4-4
“Forced” Load Sharing
Advertising