Test sequences, Lamp test, Front panel display meter calibration – GE Industrial Solutions GPS2436 User Manual
Page 75
![background image](/manuals/295714/75/background.png)
Galaxy Power System GPS2436
Issue 1 August 2012
75
Test Sequences
Lamp Test
This test verifies that All of the LEDs on the front panel of the controller are functioning
properly. No alarms are generated from this test.
Step
Action
1.
From the Default Screen, press the Menu button for the Main Menu.
2.
Using the Up/Down Arrows, Scroll to Control/Operations and press Enter.
3.
Select Start Lamp Test, and press Enter.
4.
Press Enter again to start the test, or Escape to return to the menus.
5.
Observations:
• LCD Refreshes
• Front Panel LEDs ALL turn on momentarily and return to normal
• NO alarms are generated from this test
Front Panel Display Meter Calibration
Using a calibrated digital voltmeter, measure the plant voltage from the front panel test
jacks. Follow these steps to calibrate the front panel meter display for Voltage and
Current readings: