Test sequences, Lamp test, Front panel display meter calibration – GE Industrial Solutions GPS2436 User Manual

Page 75

Advertising
background image

Galaxy Power System GPS2436

Issue 1 August 2012

75

Test Sequences

Lamp Test
This test verifies that All of the LEDs on the front panel of the controller are functioning

properly. No alarms are generated from this test.

Step

Action

1.

From the Default Screen, press the Menu button for the Main Menu.

2.

Using the Up/Down Arrows, Scroll to Control/Operations and press Enter.

3.

Select Start Lamp Test, and press Enter.

4.

Press Enter again to start the test, or Escape to return to the menus.

5.

Observations:

• LCD Refreshes

• Front Panel LEDs ALL turn on momentarily and return to normal

• NO alarms are generated from this test

Front Panel Display Meter Calibration
Using a calibrated digital voltmeter, measure the plant voltage from the front panel test

jacks. Follow these steps to calibrate the front panel meter display for Voltage and

Current readings:

Advertising