3.8.6 Battery connection of SG Series 10 & 20 kVA

SG

T

500

0_

0

1

0-

020

_UP

S

con

nec

ti

on bat

tery

_0

1

_

+

BC

When the unit is equipped with internal battery, for safety reasons it is

External battery connection

Internal battery connection

delivered with the battery fuses already inserted, but with the

The battery plug "BC" must be connected to the battery connector fitted on

battery plug "BC" disconnected.

battery enclosure just before the commissioning.

Fig. 3.8.6-1 Power connections of internal / external battery for SG Series 10 & 20 kVA

SG Series 10 & 20 kVA Max.

rating

Battery terminals:

3 AWG (25mm

2

)

Battery

+

Positive pole of the Battery

Negative pole of the Battery

Do not insert the Battery Fuses before the commissioning.

Battery cable terminations are to the Positive and Negative Terminals as shown above.
Connect wire to the Terminals using appropriate tools and appropriate torque.
Torque specification for Input / Output and DC power connections on Terminals: See section 3.8.1.

NOTE !

To meet standards concerning electromagnetic compliance, the connection
between the UPS and external battery must be done by using a shielded cable or
suitable shielded (metal) conduit!
This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer for, the secondary of the
transformer must be wye-configured with neutral solidly grounded.

NOTE !

When an additional battery cabinet is connected, no batteries must be installed
inside the UPS cabinet.