4 – installation, 1 - transport, 2 - unpacking – GE Industrial Solutions LP11 924 Series 6 & 10 kVA User Manual
Page 12: 3 - package contents
modifications reserved
OPM_LPU_11U_6K0_10K_1US_V010.Doc
11
User manual LP11 924 6 & 10 kVA UPS 1.0
4 – INSTALLATION
4.1 - TRANSPORT
Move the UPS and battery cabinet in its original package to the final destination room using a pallet truck or forklift.
CAUTION
During transport, pay attention to:
CAUTION
Check for sufficient floor and elevation loading capacity.
Transport the UPS only in upright position.
Do not stack other package on top
4.2 - UNPACKING
UPS: Cut the two wrapping bands, and remove the shipping box. Loosen the four bolts with which the UPS is fixed to the
pallet. Remove the UPS from the pallet.
Battery cabinet: Open the wooden packing around the battery cabinet and remove the shipping box. Loosen the bolts with
which the battery cabinet is fixed to the pallet. Remove the battery cabinet from the pallet.
WARNING!
Pay attention to the HEAVY WEIGHT of the UPS and battery cabinet while unloading from the pallet!
Never try to lift them by yourself!
Immediately after unpacking carefully check the integrity of the UPS and battery cabinet. In case you note recognizable
damage,
• notify the carrier and place of purchase
• contact the nearest GE Service Center.
WARNING!
In case of recognizable damage:
DO NOT connect any voltage to the unit
DO NOT put the unit into operation
The UPS is equipped with castors, which allow easy displacement of the unit. Please take appropriate measures to avoid
damage on vulnerable floors.
Recycle the packing material in compliance with all applicable regulations.
4.3 - PACKAGE CONTENTS
The standard package includes:
• UPS
• CD-ROM,
• RS232 cable,
• Insertion Bridge for connecting I/O terminal blocks
• Safety guide and
• This manual.
If the UPS is equipped with an RPA plug-in card (Redundant Parallel Architecture, right option slot at the rear of the unit)
the shipping box also contains:
• A yellow network cable and
• One bus terminator.