Installation Steps:

1. Install the Pump

• Plumb suction and discharge of pump into piping.
• Install a check valve on the suction side.
• Locate the pump as near liquid source as possible.

2. Install the Pressure Transducer

• Install the pressure transducer in the tank tee provided with the unit.
• Locate the transducer within 120” of the controller.

3. Mount the Controller

• Mount vertically in a well ventilated, shaded area with 8 inches of free air

space on every side and temperature between 34º F and 104º F.

4. Connect Input Power

• Connect the 1Ø power from a 20 amp 2-pole circuit breaker.
• Do not use GFCI protection with ABII as nuisance tripping will result.

5. Output Power Connections

• Connect the output power leads from the controller to the 3 motor leads

in the conduit box on the motor.

6. Set the motor Overload Switches (or dials, 3 and 5 HP)

• Complete systems have overloads pre-set at factory.

7. Set the Pressure - Factory pre-set is 50 PSI

• Push and Hold the Increase or Decrease Pressure Adjust Pushbutton

until the desired pressure setting is reached.

•

The maximum allowable pressure setting is 85 psi.

8. Set the Application Switches (or dials, 3 and 5 HP)

•

Minimum Speed of 10 Hz – the incoming pressure is within 20 PSI of the

desired pressure setting.

•

Minimum Speed of 30 Hz – the incoming pressure is 20 PSI or more below

the desired pressure, if pumping from a tank or if drawing a suction lift.

•

Ramp Speed – Slow - Low flow; Medium - Medium flow; Fast - High flow