Xylem IM205 Vortex Series User Manual

Page 15

Advertising
background image

Vortex Installation, Operation and Maintenance Manual

13

2. Pump support, stand, foot;
3. Switches.

Check points before operating:

• Adjust the start-and stoplevels in such a way that the motor does not make more than

20 starts per hour.

• Check that the motor is adequately cooled.

Figure 8
The motor housing should be at least 2/3 submerged for continuous operation at full load
(see Hmin.1 Figure 8).

Note: It is always good practice to drill 1/8" hole in the discharge pipe for venting air. This

will prevent the pump from air locking.

Hmin. 1

Hmin. 2

Installation Options

Advertising