6 maintenance, cleaning, disposal, 1 maintenance, 2 exchanging the fuses – YSI CR 3200 Thermoreactor User Manual

Page 29: Maintenance, cleaning, disposal, Maintenance, Exchanging the fuses, 6maintenance, cleaning, disposal

Advertising
background image

CR 3200

Maintenance, cleaning, disposal

29

ba76120e01

08/2012

6

Maintenance, cleaning, disposal

6.1

Maintenance

The CR 3200 thermoreactor is maintenance-free.

6.2

Exchanging the fuses

1

Disconnect the line power cable from the thermoreactor.

2

Pull out the fuse holder (3).

3

Exchange one or both fuses (6.3 AT).

4

Turn the fusion holder (3) so that the arrow on the housing
points to the line voltage (115 or 230 V) provided by the power
line.

5

Push the fusion holder (3) completely in.

2

3

1

Advertising