6 maintenance, cleaning, disposal, 1 maintenance, 2 exchanging the fuses – YSI CR 3200 Thermoreactor User Manual
Page 29: Maintenance, cleaning, disposal, Maintenance, Exchanging the fuses, 6maintenance, cleaning, disposal
Advertising
CR 3200
Maintenance, cleaning, disposal
29
ba76120e01
08/2012
6
Maintenance, cleaning, disposal
6.1
Maintenance
The CR 3200 thermoreactor is maintenance-free.
6.2
Exchanging the fuses
1
Disconnect the line power cable from the thermoreactor.
2
Pull out the fuse holder (3).
3
Exchange one or both fuses (6.3 AT).
4
Turn the fusion holder (3) so that the arrow on the housing
points to the line voltage (115 or 230 V) provided by the power
line.
5
Push the fusion holder (3) completely in.
2
3
1
Advertising