3 commissioning, 1 scope of delivery, Commissioning – YSI CR 3200 Thermoreactor User Manual

Page 11: Scope of delivery, 3commissioning

Advertising
background image

CR 3200

Commissioning

11

ba76120e01

08/2012

3

Commissioning

3.1

Scope of delivery

 Thermoreactor CR 3200
 Connection cable for mains connection
 Operating manual

Warning

Always keep the original packing including the inner packing. If
you have to transport the instrument, the packing protects the in-
strument optimally from hard shocks.
The original packing is also required for the appropriate return
transport of the instrument if it has to be repaired.
Please note that the warranty does not cover damage caused by
inappropriate transport.

Advertising