Initial commissioning

3.4.1 General information

CAUTION

Never look into the measuring window or put objects into the measur-

ing window during operation! The emitted UV radiation can damage the

eyes!

In the case of authorized use, inadvertent eye contact with the light

beam is not possible.

Measuring location

The sensor is prepared for operation in the outlet of the waste water

treatment plant and calibrated in the factory. The sensor is immediately

ready to measure.
How to adjust the settings is described in the following section (section

3.4.3).

User calibration after initial

commissioning

On the basis of a reference measurement ("laboratory value"), check

whether the default settings deliver sufficiently accurate measured

values or whether you want to carry out a user calibration (see section

4.3 C