YSI IQ SensorNet MIQ/JBR Module User Manual

Page 10

Advertising
background image

Installation

MIQ/JBR

3 - 2

ba76077d01

01/2012

Power supply

For power supply purposes, the IQ S

ENSOR

N

ET

system is always

regarded as one undivided system. Determine the number of
MIQ power supply modules required for the system following the rules
for the optimum power supply (see system operating manual).

Signal amplification

To amplify the signal, the MIQ/JBR divides the IQ S

ENSOR

N

ET

into

signal ranges (section A, section B).
Within a signal range, the overall cable length (SNCIQ IQ S

ENSOR

N

ET

cables + SACIQ sensor connection cables) must not be more than
1000 m. In an IQ S

ENSOR

N

ET

system, up to two signal amplifier

modules may be installed.

When data signals change between the signal ranges (section A,
section B), the signal amplification becomes effective. Signals are not
amplified within a signal range.

Fig. 3-2

Schematic diagram of the

MIQ/JBR

Overall cable length
(SNCIQ + SACIQ)

Number of
MIQ/JBR modules

Number of
signal ranges

< 1000 m

0

1

1000 m - 2000 m

1

2

2000 m - 3000 m

2

3

1

IQ S

ENSOR

N

ET

cables at the terminal connections

2

Power flow

3

Data signals

4

Bi-directional signal amplifier

5

Outside contacts on the module enclosure

Advertising