Installation and operation manual MOH1

www.lainginc.com

Filling of the system

It is mandatory to flush the floor heating loops before putting the

system in operation, because otherwise malfunction or damage to the

pump may result. We recommend using two fill valves on the primary

side of the BM mini as shown in picture . Alternatively, the system

can be filled using fill valves installed elsewhere in the system. In any

case, it is necessary to positively flush the system since otherwise the

air in the system will not be purged completely. Filling the system via

the integrated manual air vent (see picture 7) is not possible! Please

observe the position of the ball valve in the bypass. If this is in the ver-

tical position, the floor heating loops are hydraulically uncoupled from

the boiler loop. This position is ideal for normal operation (see picture

1) since the pump in the heating loop does not influence the floor

heating loop. With the valve in this position, however, the floor heating

system cannot be filled from the primary side.

To fill the floor heating loops from the heating loop side, this ball valve

must be closed (horizontal) – see pictures 2 through 6. After filling, the

valve must be opened again (vertical position). Please observe that

when filling from the primary side radiator valves on that side should

be closed in order to have maximum pump pressure available for
purging the floor heating loops.