a. Using a pipe wrench, unscrew the plastic

float blocking plug (A) from the low water
cut-off body (B).

5

If the control will be the primary low

water fuel cut-off, size the steam (top)
and water (bottom) equalizing pipe lengths
so that the horizontal cast line on the body
is

1a” (35mm) below the boiler’s normal

water level,

but not lower than the lowest,

safe permissible water level, as deter-

mined by the boiler manufacturer.

OR

If the control will be the secondary low

water fuel cut-off, size the steam (top) and
water (bottom) equalizing pipe lengths so
that the horizontal cast line on the body is
at or above, the lowest, safe permissible

water level, as determined by the boiler

manufacturer.

STEP 2 - Installing the Low Water Cut-Off

STEP 1 - Determine the Elevation at Which the

Low Water Cut-Off/Pump Controller Must be Installed

INSTALLATION

TOOLS NEEDED:
Two (2) pipe wrenches, one (1) flathead screw
driver, and pipe sealing compound.

IMPORTANT: Follow the boiler manufacturer's
instructions along with all applicable codes and
ordinances for piping, blow down valve and water
gauge glass requirements.

1

3

/

8

"

STEAM EQUALIZING PIPE

VERTICAL EQUALIZING PIPE

BLOW DOWN VALVE

NORMAL BOILER WATER LINE

AS A PRIMARY
LOW WATER CUT-OFF/PUMP CONTROLLER

BURNER “CUT-OFF LEVEL” AT CAST LINE

LOWEST PERMISSIBLE
WATER LEVEL

(35mm)

WATER

EQUALIZING

PIPE

STEAM EQUALIZING PIPE

VERTICAL EQUALIZING PIPE

BLOW DOWN VALVE

AS A SECONDARY
LOW WATER CUT-OFF/PUMP CONTROLLER

BURNER “CUT-OFF LEVEL” AT CAST LINE

LOWEST PERMISSIBLE
WATER LEVEL

BURNER OFF

WATER

EQUALIZING

PIPE

B

A

B

A

B

A

Series 150S

(except Model 150S-B)

Models 150S-B

Series 157S

Advertising