Foundation requirements – Xylem P81673H Series 1510 User Manual

Page 16

Advertising
background image

Guideline

Explanation/comment

Take into consideration the occurrence of unwanted

noise and vibration.

The best pump location for noise and vibration

absorption is on a concrete floor with subsoil

underneath.

If the pump location is overhead, undertake special

precautions to reduce possible noise transmission.

Consider a consultation with a noise specialist.

When possible, locate the pump below the fluid level.

This facilitates priming, ensures a steady flow of liquid,

and provides a positive suction head on the pump.

Foundation requirements

Requirements

• The foundation must be able to absorb any type of vibration and form a permanent,

rigid support for the unit.

• The foundation must weigh at least 2-1/2 times the weight of the pump unit.
• Provide a flat, substantial concrete foundation in order to prevent strain and distortion

when you tighten the foundation bolts.

• Sleeve-type and J-type foundation bolts are most commonly used. Both designs allow

movement for the final bolt adjustment.

• Tie the concrete pad in with the finished floor.
• Use foundation bolts and larger pipe sleeves to give room for final bolt location.

Diagram

2

3

1

4

1.

Foundation bolt

2.

Pipe sleeve

3.

Washer

4.

Built-up concrete foundation

Installation

14

Series 1510 Installation, Operation, and Maintenance Manual