Chapter 2: installation and operation, Chapter two • installation and operation – Extron Electronics SCP 250 User Guide User Manual

Page 9

Advertising
background image

SCP 250

2

Chapter Two

Installation and Operation

Installation Overview

Preparing the Site, Installing the Electrical Box

Rear Panel Connectors and Switches

Cabling

Front Panel Features and Operation

Testing/Troubleshooting

Mounting the SCP to the Electrical Box

Advertising