Installation, 1 safety precautions, 2 tools required – Alpha Technologies Cordex HP CXRF 48-12kW User Manual

Page 21

Advertising
background image

19

9400000-J0 Rev C

6. Installation

The equipment is suitable for installation in Network Telecommunication Facilities.

WARNING!

This system is designed to be installed in a restricted access location that is inacces-
sible to the general public.

The following procedure is written for qualified personnel to install this product in a clean and dry environment.

For the battery installation, refer primarily to the manufacturer’s manual.

6.1 Safety Precautions

Refer to the Safety section near the front of this manual before beginning this installation.

6.2 Tools Required

Various insulated tools are essential for the installation. Use this list as a guide:
• Battery lifting apparatus if required
• Electric drill with hammer action, 1/2" capacity
• Various crimping tools and dies to match lugs used in installation
• Load bank of sufficient capacity to load largest rectifier to its current limit
• Digital voltmeter equipped with test leads
• Cable cutters
• Torque wrench: 1/4" drive, 0 - 150 in-lb
• Torque wrench: 3/8" drive, 0 - 100 ft-lb
• Insulating canvases as required (2' x 2', 1' x 1', 3' x 3', etc.)
• Various insulated hand tools including:

- Combination wrenches - Ratchet and socket set

- Various screwdrivers.

- Electricians knife

• Battery safety spill kit required for wet cells only:

- Protective clothing

- Face shields

-

Gloves

-

Baking

soda

- Eye wash equipment

• Cutters and wire strippers (#14 to #22 AWG) [2.5 to 0.34 mm²]

Advertising
This manual is related to the following products: