3 installation, 1 initial inspection, 2 input power requirements – B&K Precision 1693-1694 - Manual User Manual

Page 8: Installation, Initial inspection, Input power requirements

Advertising
background image

6

3 Installation

3.1

Initial Inspection


This unit is tested prior to shipment. It is therefore ready for immediate use upon
receipt. The initial physical inspections should be made to ensure that no damage has
been sustained during shipment.

Inspect the packing box on receipt for any external damage. If any external damage is
evident, remove the instrument and visually inspect its case and parts for any
damage. If damage to the instrument is evident, a description of the damage should
be noted on the carrier’s receipt and signed by the driver or carrier agent. Save all
shipping packaging for inspection. Forward a report of any damage to the agent
through which the unit is procured.

Retain the original packing in case subsequent repackaging for return is required. Use
of the original packing is essential.

After the mechanical inspection, verify the contents of the shipment. The items
included with the instrument are:

Power cord

Instruction manual

Remote control connector

If the contents are incomplete, or if the instrument does not pass the specification
acceptance tests, notify the local service center.

3.2

Input Power Requirements


The power supply has a universal input and can operate in any country that uses a
mains voltage within 100-240 VAC, 50Hz/60Hz.

Advertising