Standard grain cart tarp installation – J&M GRAIN CARTS Leaner Setup User Manual

Page 15

Advertising
background image

Slide all *bows under the pre-tensioned ridge cables. Then install two 1/4”-20 x 3/4” serrated

flange hex bolts and two 1/4”-20 serrated flange hex nuts on each end of all *bows. Line the bows

up with the holes in the sideboards and not the drip edge if the holes are different. If drip edge

holes are different, they will need to be drilled.

STEP - T8.0

STEP - 1.0

STEP - T9.0

View of all *bows installed under three ridge cables.

*See parts list for number of bows needed per cart size.

-14-

STANDARD GRAIN CART TARP INSTALLATION

Advertising