2 important recommendations, 1 ventilation, 1 chimney versions – DE DIETRICH DTG(E)130 - 35_45_65_90_115 Eco.NOxPlus User Manual

Page 4: 2 forced flue versions, 2 maintenance, 3 adapting to another gas type, Important recommendations, Chimney versions, Forced flue versions, 2 maintenance 2.3 adapting to another gas type

Advertising
background image

4

DTG(E)130 - 35/45/65/90/115 Eco.NOxPlus, MC35E / MC45 / MC65 / MC90 / MC115

10/06/10 - 300005222-001-F

2 Important recommendations



For a proper operating of the boiler, follow carefully the

instructions.



Any intervention on the appliance and heating equipment

must be carried out by a qualified technician.



The manufacturer is not liable for any improper use of the

appliance or failure to maintain or install the unit correctly

(the user shall take care to ensure that the system is

installed by a qualified fitter).



Check the seal on the gas and water pipe connections.



Check that the appliance is properly set for the type of gas

used.



Keep to the polarity shown on the terminals: phase (L),

neutral (N) and earth

4

.



Check regularly that the installation contains water and is

pressurised.



Burn hazard in direct contact with the flame inspection
window.

2.1 Ventilation

2.1.1

Chimney versions



Do not obstruct the air inlets in the room (even partially).

France: the cross section of the aeration vent, which is compulsory

in the boiler room in which the boiler is installed, must comply with the

DTU 61.1 (P 45 204) standard and, in particular, with the instruction

on boiler room layout (Book 1764 April 1982).
Belgium:the cross-section of the aeration vents, which are

compulsory in the room in which the boiler is installed, must comply

with the NBN D51-003 standard.

Germany: the cross section of the ventiliation vents, which are

compulsory in the room in which the boiler is installed, must comply

with the VDI 2050 form 1 standard and with other prevailing

regulations.
Other countries: the cross section of the aeration inlet, which is

compulsory in the premises in which the boiler is installed, must

comply with the standards in force in the country.

2.1.2

Forced flue versions

It is not necessary to provide ventilation of the premises in which the

boiler is installed. Ventilation is required if a mechanical connection

to the gas exists.

2.2 Maintenance

- The servicing and cleaning of the boiler and the sweeping of the

flue gas pipe and the bleed pot must be done at least once a year

by a qualified professional.

- Regularly check the level of water in the system and top up if

required, taking care that cold water is not added suddenly into the
boiler when it is hot.

- We recommend taking out a maintenance contract.



Do not drain the installation, except in cases of absolute

necessity. For example: Several months' absence with the

risk of ice in the building.

2.3 Adapting to another gas type

„

Belgium:

The operations required to switch from one gas to another must be

carried out by a SERV'elite technician.

„

Other countries:

The operations required to switch from one gas to another must be

carried out by your fitter.

Advertising