DE DIETRICH VIVADENS MCR-P 24_28 BIC User Manual

Page 23

Advertising
background image

8. Wait until water comes out of the bleed valve and then close the

bleed connection.

CAUTION

The water may still be hot.

9. After venting, check whether the pressure in the installation is still

sufficient. Add water to the installation if necessary.

10.Switch on the boiler. A vent cycle of a duration of around 3 minutes

is carried out automatically.

11.Set the room thermostat or the regulator.

T000218-A

T000228-A

1,5 ... 2 bar

T000183-A

MCR-P 24/28 BIC

5. Checking and maintenance

060513 - 127686-01

22

Advertising