Mounting, installation, adjustment

Create

d

by EBCCW

0

0

:06

Page 29 of 68

5478EN-3

5.2

Assembly

This paragraph describes a number of operations for Spiral Elevators that
are not delivered fully assembled. After having finished mounting the Spiral
Elevator, the Spiral Elevator can be integrated (Section 1.4) in a system.

5.2.1

Motor

The gear motor may be delivered separately with the Spiral Elevator and
then has to be mounted on site.
First check if all the required parts are present:

•

Gear motor

•

Grease

•

Torque arm

•

Key for shaft

•

Fasteners (screw and washer)

The key and torque arm fastening to the frame may be pre-assembled.

The required tools are:

Procedure:

•

Determine the installation orientation of the gear motor.

•

Apply installation grease on the shaft to slide the gear motor onto
the shaft easier and prevent any fretting corrosion.

•

Attach the torque arm to the gear motor with the appropriate
fixings.

•

Place the locking ring (circlip) in the gear motor or move to the
desired groove in gear motor (if not already in the correct
position).

Open-end spanner

Ring spanner

Internal spring pliers

Advertising