Flowline LC30 Thermo-Flo User Manual

Page 12

Advertising
background image

12 of 14 

LC900008 

Rev A

FLOW SWITCH CALIBRATION 

Step Eight 

Set Points: If the preset factory calibration is not adequate for your application, follow the calibration steps 
listed below.  Note: the switch's internal LED will be on when the switch detects no‐flow and will off when the 
switch detects flow. 

1. Install  the  fitting  and  flow  switch  as  described  in  the  Installation  section  of  this  manual.    Turn  the  flow 

switch and controller power on and adjust the flow rate to the application setting.  If the medium to be 
sensed is likely to be subject to high temperature variations, the flow switch 
should be set at the highest normal temperature likely to be encountered. 

2. Locate the potentiometer knob at the top of the flow switch.  The red LED 

is  visible  through  the  potentiometer.    (If  the  LED  is  on,  slowly  adjust  the 
potentiometer  counterclockwise,  with  a  small  flat  head  screwdriver  until 
the  LED  turns  off.)    The  adjustment  is  a  single  turn  270°  potentiometer.  
The  initial  response  time  of  the  flow  switch  after  adjustment  is  1  to  10 
seconds.    Adjust  the  potentiometer  in  slow  increments  and  wait  for  the 
response.  If the LED is off, slowly adjust the potentiometer clockwise until 
the light turns on.  Then turn the potentiometer counterclockwise to bring 
the  LED  off  at  a  reliable  setting.    Remember,  adjust  the  potentiometer  in 
slow increments and wait for the response.  

3. Verify that the new calibration is correct by lowering the system flow rate below 

the set point and check to see that the red LED turns on.  Then increase the flow 
rate above the set point and verify that the red LED turns off accordingly. 

Liquid Switch 

FT10 ‐ _ _ _ 5 or FT10 ‐ _ _ _ 2 Series 

Gas Switch 

GT10 ‐ _ _ _ 5 or GT10 ‐ _ _ _ 2 Series 

 

 

Accessing the Adjustment Potentiometer:  Remove the two screws from the top of the printed circuit board 
(PCB) and gently slide the PCB from the housing.  Use caution when removing the PCB.  You will now be able 
to see the potentiometer through the housing.  Make any necessary adjustment.  Note: Electrical wiring of any 
liquid  level  control  system  should  be  performed  in  accordance  with  all  applicable  national,  state,  and  local 
codes. 
 When completed, gently return PCB into housing and replace the two screws. 

 

Advertising