English – Burkert Type 0450 User Manual

Page 14

Advertising
background image

12 - 8640-0450

A

SSEMBLY

AND

C

OMMISSIONING

english

Check connections, voltage and operating pressure!

Make sure that the max. operating data (see nameplate) are
not exceeded!

Check that configuration of connections 1 and 3 is according
to instructions; under no circumstances may they be
exchanged!

With electrical operation, turn the manual override knob to
automatic (0)!

Measures to be taken before commissioning

0 bar, psi, kPa

Example

Assembly and commissioning

Interventions shall be carried out only by specialist

personnel using suitable tools!

Before intervening in the system, always switch off the

voltage supply!

Clean the piping before assembling the valve!

If necessary, install a dirt trap upstream to avoid

malfunctions.

ATTENTION!

Lines and valves shall not be loosened in systems under pressure!

In no case use the coil as a lever when screwing in connections!

Make sure operating conditions match the performance data of the device!

Avoid backpressure in the exhaust air channels by using large-volume silencers!

Advertising