14.4. Connecting the process controller Type 8793

→

First connect the process controller as described in chapter “14.2. Connection of the positioner Type 8792”.

14.4.1. X5 - M8, 4-pole circular connector,

plug assignments of the process actual value input

Input.type* Pin

Wire.
colour**

Configuration

DIP.
switches

On.the.
device.side

External.circuit

4 – 20 mA-
internally
supplied

1

brown

+24 V transmitter supply

Switch
on left

1
2

3
4

Transmitter

GND

2

white

Output from transmitter

3

blue

GND (identical with GND
operating voltage)

4

black

Bridge to GND (Pin 3)

4 – 20 mA-
externally
supplied

1

brown

not used

Switch
on right

2

white

Process actual +

2

4 - 20 mA

3

blue

not used

4

black

Process actual –

4

GND 4 - 20 mA

Frequency-
internally
supplied

1

brown

+24 V sensor supply

Switch
on left

1

+24 V

2

white

Clock input +

2

Clock +

3

blue

Clock input – (GND)

3

Clock – / GND
(identical with GND
operating voltage)

4

black

not used

Frequency-
externally
supplied

1

brown

not used

Switch
on right

2

white

Clock input +

2

Clock +

3

blue

Clock input –

3

Clock –

4

black

not used

Pt 100
(see infor-
mation
below)

1

brown

not used

Switch
on right

2

3
4

Pt 100

2

white

Process actual 1 (power supply)

3

blue

Process actual 3 (GND)

4

black

Process actual 2 (compensation)

*

Can be adjusted via software (see chapter “21. Start-up sequence”).

**

The indicated colors refer to the connection cable available as an accessory (918718).

Table 15:

Pin assignment; X5 - M8, 4-pole circular connector - process actual value input

Connect the Pt 100 sensor via 3 cables for cable compensation reasons. It is essential to bridge Pin 3
and Pin 4 on the sensor.

When the operating voltage is applied, the process controller is operating.

→

Now make the required basic settings and actuate the automatic adjustment of the process controller. The
procedure is described in chapter “21. Start-up sequence”.